Monday, 11 March 2013

Pothole Update

The temporary repairs to the potholes on Stirchley Interchange have proven to be very temporary indeed with several of them opening back up again in the heavy rain.

The potholes on the entrance to Beaconsfield and Bembridge have been repaired and Beaconsfield has been partial resurfaced near the entrance to the school.

I am waiting for details of a capital works programme that includes road repairs for Brookside due to start in April before I report any more problems with road damage.